Laying of 12" Crude Oil Line , Soveyreh to Rag-e-Sefid Prod . Unit , 40 kms
Water Pipeline , Booshigan to Bushehr , 73 kms
Kangan natural gas project phase construction of 4 Gas Sepration Plants & Pipeline - Phase 2 - Kangan
Laying of 56" Gas Pipeline Phase 1 , Section 2 to Gas Booster Station S1
Laying of 18"as Pipeline - In INDIA 130 kms (EPC)
Laying of 56” Gas Pipeline , IGAT II , Section B
Aghar Dalan Gas Project , Laying of 24" Gas & 3" Condensate Pipelines
Laying of 24 " Gas Pipeline from Darod to Jafrabad , 103 kms - In India (EPC)
laying of 26" Crude Oil Loop Line
Qeshm Water supply Project (25 Km x 6")
Expansion of Bahregan Oil Production Unit
Laying of 48” Gas Pipeline , North – North Easte (pc)
IGAT VI Gas Pipeline 56" , Section 3 /150 km
Construction of Maroun Production Unit
Emergency 16” Crude Oil Supply Line
Gas Pipeline , Qom to Hassanabad- Tehran
Laying of 16 " Gas Pipeline , Omidiyeh to Abadan
IGAT III, Section 3 - Laying of 56" Gas Line
Gas Distribution System , South of Tehran
Laying of 56" Main Gas Pipeline , South Pars Field (EPC)
Rerouting the IGAT III (Export Gas Pipeline 56" )
Zahedan main Water Supply Pipeline Project
Laying of 30” Gas Pipeline , panvel-Dabho In INDIA (EPC)
Laying of 56” Crude Oil Line Moharram Project , section 3 , Phase 1 , from Mond River to Bandar –E-Taheri
Kangan natural Gas Pipeline System phase 1 -Nar
Water Distribution Pipelines to Vali-E-Asr Gas Refinery
Looping of crude oil pipeline between Tang-E-Fani P/S to Razan P/S (86 Km x 26")
Moharram project, crude oil pipeline, Phase 1, Segment 3 (120 Km x 56")
Re-routing 56" gas pipeline at km 406 Pataveh (2 Km x 56")
Main oil pipeline from Afrineh pumping station to Kermanshah refinery (171 Km x 16")
Water supply to petrochemical industrial area at Bandar Imam Khomeini & Mahshahr (130 Km x 24")
Water supply system for Bandar Imam Khomeini & Ommidieh (53 Km of Main line & 50 Km of network x 8")
Main oil pipeline from Cheshmeh Khosh production unit No.1 to Ahwaz production No.3 (151 Km x 18")
Crude oil pipeline from Marun production unit No.1 to Marun production unit No.2 (20 Km x 20" & 22")
Gas supply pipeline to Abyek cement mill (52 Km x 12")
Gas supply pipeline from "Qeshm island" to Bandar Abbas (72 Km x 12")
Gas supply pipeline from Ommidieh to Abadan refinery (131 Km x 16")
Bushehr 2nd Water Pipeline Project (140 Km x 20")
Water Transmission Pipeline (140 Km x 14")
Water Connection Line (73 Km x 20")
Water supply line to Miankouh, reservoirs & related facilities (24 Km x 10")
Water supply pipeline from Sar-Bandar to Ommidieh (72 Km x 30")
Gas Pipeline re-route at Assaluyeh (14 Km x 56")
IGAT II loop at Tashan (60 Km x 56")
Gas Pipeline from SPP4&5 to Kangan (67 Km x 56")
Diesel Pipeline from Kermanshah to Sanandaj (129 Km x 10")
IGAT III pipeline, Noorabad - Pataveh (131 Km x 56")
Zahidan Water supply pipeline (90 Km x 36")
Gas liquid pipeline from Aghar to Dalan (2x89 Km x 3" to 24")
Iranian gas trunk line (IGAT-II) section B (120 Km x 56")
Laying of 36” Gas Line for Bawana to Nangal Section -1 , 150 kms / in India (EPC)
Bisoton-Kermanshah 30" x 34 Km Gas Pipeline
IGAT 6 (Koohdasht-Bisoton) 56" ×120 Km Gas Pipeline
North Yaran Oil Field Development-Export Pipe line 93 Km × 8-12"
Bawana-Nangal Gas Pipeline Construction (150 Km x 56")
MMPL Pipeline Project (128 Km x 18" + 6 Km x 12") (C)
Panvel-Dabhol Gas Pipeline Project - Phase 2 - Part A (68 Km x 30" + 14 Km x 4" spurline)
Second North & NorthEast Gas Pipeline, Section I (174 Km x 48")
14 Km 56" Re-route Gas Pipeline complementary works and Hot Tap
Gas supply pipeline of south Tehran township (Sizdahom-E-Aban) (18 Km x 12")
Gas Pipeline Abyek / Tehran (85 Km x 12")
Crude oil pipeline to Karanj production unit (17 Km x 20")
Water supply system, Khuzestan army base (10 Km x 10")
Water supply & sewerage system (Ahwaz officers residential area) (12 Km x 8")
Installation of 4 Main Units of Arak Petrochemical Complex
Construction of Bandar Abbas Gas Condensate Refinery , 3 train
Construction of Water Supply
Civil & Conctrete Works & Steel Structure for Khor-e-Jafari Pipeline , Section B
Installation of Mechanical , Electrical & Instrumental System
Shahid Hashemi Nejad Gas Treating Plant Phase2 Capacity : 500 MMSCFD
Borzouyeh Petrochemical Complex 4 th Aromatic
Sasan Oil Field Production Unit & Desalting Plants
Curde Oil Pumping Station to Kermanshah Province Iran
3 Methanol Tanks
Ganaveh Crude Oil Storage Tank EPC Project
South Pars Phase 20&21 LPG Tanks EPC Project
Bid Boland II - Package B (Pipelines & Mahshahr Storage Facilities) EPC (including complete all storage facilities in Mahshahr)
Butane & Propane Cryogenic Full Containment Storage Tanks for South Pars Phases 4&5 (2x45000 + 2x35000 m3)
Kangan Natural Gas, Phase II
Water supply reservoirs & related facilities, Kangan natural gas project
Kangan Natural Gas, Phase I
Potable water concrete reservoirs (4x25,000 m3)
Potable water concrete reservoirs (16,000 m3)
Potable water concrete reservoirs (8,000 m3)
Oil depots & loading facilities
Tank farm & utility buildings
Tank farm & utility buildings & related facilities
Karanj Oil Production Unit Project - No.1
Fereydoon Oil Field Production Unit
Expansion of Ahwaz production unit No.1 (from 82,000 to 302,000 B/D capacity)
Gavarzin gas dehydration plant of "Qeshm Island" gas supply project
FEREYDOON AND ARDESHIR OIL FIELDS
Ardeshir production facilities at "Kharg Island"
Fereidoon production facilities at "Kharg Island"
Expansion of Ahwaz production unit No.2 phase 1 (from 41,000 to 185,000 B/D capacity)
Wellhead separator at Marun No.2
Sassan crude oil desalting & stabilization plant
Ahwaz booster station No.1
Oil terminal for 8" crude trunk line at Kermanshah refinery
Naft-Shahr pumping station
Patagh booster station
Karanj production unit No.1 (1,000,000 B/D capacity)
Gas wellhead installations, "Qeshm Island"
Water pump station, reservoirs & related facilities at Haft-Tapeh
Integrated Methanol & Ammonia Plant
Installation of Mechanical, Electrical and Instruments Equipments in third uinit14
Fajr Petrochemical Complex, Piling / Civil / Structural / Piping Works in Site 3
Assaluyeh Green Tank General Construction Works
3 Methanol Tanks + One Extra Tank
Koohdasht-Bisoton 56" ×120 Km Gas Pipeline
North Yaran Oil Field Development-Export Pipe line
Genaveh Crude Oil Storage Tanks 10 MBL
Area 2 - South Pars Gas field Development, Phase 13
Bandar Abbas Gas Condensate - Area 20&30 - EPC
Bandar Abbas Gas Condensate Refinery
LPG Tanks of South Pars Phases 20&21
Yadavaran Oil Field Development - Early Production Facilities
Khangiran Refinery, SRU 4 Unit
Fajr Petrochemical Complex, Site 3, Site 5 & 3rd Air terrain
Fanavaran Petrochemical Complex, AA & CO units
Khangiran Refinery CGC units
Khangiran Refinery CMF units
Borzooyeh Petrochemical Complex, 4th Aromatic Plant
South Pars phases 4&5, onshore facilities
Mobin Petrochemical Complex, Power & Steam generation unit civil works
Shahid Hasheminejad refinery - Phase 2
A.A, V.A, B.D & P.B.R units/Arak petrochemical complex
Kangan natural gas project, phase 2- Nar gas transmission pipeline & gas separation satellites
Kangan natural gas project, phase 1- Nar gas separation satellites
Sulphuric Acid plant at Abadan refinery
Marun production unit No.6 desalting, 20" gas pipeline & 24 Crude oil line
42" Goreh Jask Pipeline Project L 1-1
South Pars phases 4 & 5 onshore Facilities
Construction of 36 inch Bid Boland feed Pipeline - C
Abadan Petrochemicals Compressor Station Remain Works EPC
Installation of “Gavarzin” Gas Separation & Dehydration Plant & Related 86 kms Piprlines
Dehloran Gas Compressor Station EPC
Gachsaran HDPE - Non-Process Units & Buildings EPC2
Site Preparation & Civil Works for ILAM Gas Refinery
3 Methanol Tanks+1
Bid Boland Gas Treating Plant II, Package B (Pipelines and Mahshahr Storage Facilities) EPC
ESFAHAN STEEL MILLS PROJECT Fabrication and installation Of 14 units
Construction of Zarand Kerman Coal Washing Complex
Construction of Sari Pulp & Paper Complex
Installation of Parts of Ahwaz Steel Complex
Parchin black powder mill
Coke & Chemical Plant, Isfahan steel mills
Nuclear Fuel Research Center, Project 1
Semirom fireclay / Refractory production plant
Pulp & paper production plant / Mazandaran wood & paper industries
Ahwaz direct reduction steel mills
Zarand coal washing plant
Hygenic & Health protection facilities of Isfahan steel mills converter
Staff residential area/housing project of Shahid Chamran university
Construction of Laft Loading Terminal
Training center/building
Khorasan Housing & Urban Authority
Completion of Mashad emergency hospital
Staff houses types B&C (10 units)
Bank-E-Bazargani building
Housing area (60 units)
Ilam Gas refinery Civil works (Site preparation, roads & buildings)
Mobin Petrochemical Complex, Power & Steam Generation Unit Civil Works, Assaluyeh
Construction Camps for total 4th Aromatic Contractors
Senior staff housing, bowling Ally & maintenance shop
Army H.Q building
Health centers
S.S.O bachelors quarters
Kermanshah refinery laboratory building
Kermanshah refinery guest house
Access roads to oil well sites (30 km)
Expansion of Heshmatieh hospital
Water supply system of Janatabad Gooshlagar-Nematoo border towns
Water supply facilities, water tanks & civil work of Torghabeh, Salehabad, Feizabad & Bardaskan
Access road to gas wellhead sites "Qeshm ilslan" (25 km)
Oil loading terminal at Laft
Kakhak/Gonabad dikes